Projekt mspr@job1
Jump to navigation
Jump to search
How I move the MSPR site from job4 to job1
Preparation
- Install standard opensuse 12.1
- Add repositories pacman, nvidia, vlc
- Install the following packages
zypper install apache2 php5 hg apache2-mod_php5 php5-devel php5-pear gcc-c++
- Install db2 express-c 9.7.4
- Create instance db2mspr
- Configure instance like db2inst4 on job4
db2 update dbm cfg using numdb 2 federated yes DFT_MON_BUFPOOL on DFT_MON_LOCK on \ DFT_MON_SORT on DFT_MON_STMT on DFT_MON_TABLE on DFT_MON_UOW on \ INSTANCE_MEMORY 524288 SHEAPTHRES 200000 INTRA_PARALLEL YES
- Create connect user db2inst2 (required because tables have this schema)
- Create loader user mspr (loads data from mspr web/xml pages)
- Clone mspr repository to /home/joachim/workspace/mspr (for scripts and docs)
- Install pdo for db2 (see howto in database/)
- Enable apache to access instance db2mspr (DB2INSTANCE in /etc/sysconfig/apache2, export?)
- Install scripts for import and web
- all in web/ except gen_* to /srv/www/htdocs
- util/mspr-* to /usr/local/bin
- database/ta_mqt_refresh.sh to /usr/local/bin
Test Installation
next task:
- restore database from last backup and logs from job4 and document steps
- check db settings are the same as on job4
- Create portforward public :801 to job1:80
- Check if pages show correct results
- Setup cron for data imports
- Testrun for data import
Production Switch
- disable update on job4
- restore db again
- test again
- move public :80 port